The Oregon Department of Transportation has announced the start of a paving project along Highway 38 between Elkton and Drain. The project, which covers a stretch of approximately 9 miles, aims to improve the condition of the road and enhance safety for drivers traveling in the area.
The repaving project is part of ODOT’s efforts to maintain the state’s infrastructure and ensure smooth and safe travel for motorists. The project will involve resurfacing the existing pavement, repairing any damage, and upgrading road markings and signage to meet current safety standards.
Construction crews will be working on weekdays from 6 a.m. to 7 p.m., and occasional weekend work may be necessary to expedite the project. Drivers are advised to be aware of lane closures and speed reductions in the construction zone and to follow all posted signs and instructions from flaggers.
Residents and businesses along Highway 38 are encouraged to plan for potential delays and consider alternative routes during construction. ODOT has assured that efforts will be made to minimize disruptions and complete the project as quickly as possible.
The paving project is expected to enhance the driving experience for those traveling between Elkton and Drain, providing a smoother and safer road surface for commuters, tourists, and local residents. The project is an essential investment in Oregon’s transportation infrastructure, ensuring that highways remain in good condition and meet the needs of the growing population.
For more information and updates on the Highway 38 paving project, motorists can visit the ODOT website or follow local news outlets for the latest developments.
Source
Photo credit news.google.com